Lidar Magazine Article Laser Scan to BIM
December 30, 15
With Windfarms becoming a more popular form of renewable energy our client Energia asked us to put forward a tender package for a topographical survey for a proposed 20kv overhead line running a distance of 6km route through difficult terrain. The purpose of this project was to link two Windfarms in Tipperary and to have detailed design profiles.
Please see below a sample profile from this project.
If you liked this project, you may be interested in these projects: